Works continue at the MPavilion Relocation site in Docklands with the concrete base for the timber deck seating poured and stripped, providing an excellent concrete finish ready for the timber seating to be built on top.

The strip footings for the precast concrete seating are also complete, with the erection of the retaining wall formwork to follow.