Shot Towers Stairs, Melbourne Central

  • Client: GPT Group
  • Architect: ARM Architects
  • Project Manager: Maben Group

Substantial demolition works were undertaken to remove structural floor slabs and concrete stairs within an operating shopping centre and major link to the Melbourne Central Train Station.  The upper mall floor structure was extended over the void around the shot tower and new tenancies were inserted below.  The existing mall floor finishes were removed and replaced and a timber feature stair and social meeting area was constructed to link the retail floor above.

Works were completed with minimal disruption to the adjoining tenancies which continued to trade throughout the works.