University Hill Factory Outlet

  • Value: $14 Million
  • Client: MAB Corporation
  • Architect: i2C
  • Date: 2014

The University Hill Factory Outlet project consisted of an extension to the existing single level retail area of 5835sqm, to provide an additional 43 tenancies, the reconfiguration of part of the existing centre, a new loading dock facility and a lower ground carpark.

The project required six separable portions to be delivered in order to maintain access to the existing lower ground carpark, loading dock facilities and essential services to the existing centre. The structure was built in two halves, to allow the existing loading dock to remain functional until the new loading dock was in place.

Maben Group has entered this project into the 2015 MBAV Excellence in Construction of Commercial Buildings Awards.

Photographs by Lisbeth Grosmann and Jenna Fahey-White.