The installation of concrete precast panels and structural steel has transformed the Woolworths box, with service rough and roofing works beginning this week.

The casual dining mall concrete slab entry has been poured and the Stage 2 tunnel has been installed, allowing the remainder of the concrete infill slabs on the existing slab to be poured for the new specialty tenancies and mall.

Back