Brackets are currently being installed to each of the 43 existing outriggers onsite at Collins Place. Each of the canopy frames will sit on and be bolted to these brackets.

The Collins Place team eagerly awaits the first load of canopy frames which are programmed to be installed after the Grand Final weekend.