The suspended deck has been formed and reinforced. Final inspections are being carried out prior to the concrete pour. This section of floor space will add to the increasing upper ground level floor area and is the second last concrete slab pour.

Tenancy shop front steel and partition walls are currently being erected, giving shape and layout for the future mall expansion.

Back