The sub base preparations for the entry path to the building have commenced, after the installation of the glazed screens. The Perimeter concrete spoon drain is currently being formed around the building. All accommodation units have been painted, and services fitted off. The wardrobe doors have been hung, with shelving left to be installed. Painting in the atrium has commenced, on the east side.

Back