Over the past 2 weeks the team at Quest Pacific Epping have been working hard and fast!
The level 1 slab and stairs up to level 1 have been poured.
The stair master installation is now underway along with the framing for level 2 transfer slab.
Screens and precast cores from level 1 have been installed and the precast to the lift core is complete.