Congratulations to the Maben delivery team, GPT Group, Lockbridge, Carr, Jan Flook and H2o Designs on the recent completion of the stunning water feature at Highpoint! 

Did you know the water feature ceiling has over 25 thousand individual tubes hanging from the cassette above? Each tube was required to be laser cut to different lengths to attain the wave-like visual effect.

Well done and thank you to everyone involved in the successful installation of this standout addition to Highpoint.

Back